Monday, October 19, 2026

PROTECT MCDONALD AVENUE. MAKE OUR VOICES HEARD.

Our Neighborhood Deserves Answers: Help Us Challenge DOT’s McDonald Avenue Bike Lane Proposal

My name is Troy Martin. I live on McDonald Avenue in Windsor Terrace. My child was struck by an e-bike on the way to school after a 53-foot truck turning onto Caton Avenue blocked the intersection, allowing the e-bike rider to run the red light. This was not an abstract traffic concern for my family. It was a frightening, personal experience that made me painfully aware of the dangers of living along this busy truck route.

We are asking our neighbors to help fund a legal challenge to the NYC Department of Transportation’s proposed protected bike lane on McDonald Avenue. We believe this project raises serious questions about how DOT evaluates traffic, safety, and the impact of major roadway changes on the surrounding community. Before construction moves forward, we believe those questions deserve independent legal scrutiny.

We want to be clear about something from the start: we are not anti-bike-lane. We support bike lanes and safer streets. Our concern is whether McDonald Avenue is the right location for this project, whether DOT has adequately evaluated the consequences, and whether the agency has followed the required procedures.

A roadway network cannot be planned one street at a time

Our biggest concern is that DOT appears to be treating the McDonald Avenue bike lane proposal separately from the larger transportation network it will affect.

In 2023, the City Council passed Local Law 171, requiring DOT to redesign New York City’s truck route network. The law called for a review that included safety, congestion, existing freight patterns, and other factors. DOT published its redesign report in November 2025 and implemented the revised network in October 2026. Read DOT’s report.

Yet we have not seen a clear explanation of how the McDonald Avenue bike lane proposal was evaluated alongside that truck-route redesign.

Consider the corridor running from the Prospect Expressway and 10th Avenue through McDonald Avenue, Caton Avenue, and toward Linden Boulevard. These streets are part of a connected transportation network carrying cars, trucks, buses, and emergency vehicles. Changes to one part of the corridor can affect the others.

How can DOT make a permanent change to McDonald Avenue without clearly showing how that change fits into the broader network?

Caton Avenue should be a warning, not an afterthought

In 2015, Caton Avenue was redesigned from two traffic lanes in each direction to one in each direction, with additional space for left turns and other safety improvements. Since then, residents and community boards have continued to raise concerns about congestion, truck traffic, and pedestrian safety in the area.

DOT’s own 2025 truck-route redesign report identifies Caton Avenue, between Fort Hamilton Parkway and Bedford Avenue, as a Truck Priority Safety Corridor. The report also identifies Caton as a corridor requiring more in-depth analysis, outreach, and coordination. See the DOT report.

That raises an important question: What has DOT learned from the experience on Caton Avenue, and how has that experience informed the McDonald Avenue proposal?

We have not seen a public analysis that adequately answers that question. Nor have we seen a clear explanation of how the truck-route redesign and the McDonald Avenue project were evaluated together.

We are not claiming that the two streets are identical or that the same outcome is inevitable. We are asking DOT to demonstrate that it has examined the relevant lessons and considered the effects of the proposed change across the entire corridor.

What about the next decade of BQE construction?

There is another major issue that deserves attention: the planned reconstruction of the BQE’s triple-cantilever section in Brooklyn Heights.

The City’s current plans anticipate major rehabilitation beginning in 2030 and continuing through the following decade. Read the City’s BQE Central project information.

Beginning in 2022, DOT used this part of our neighborhood as a truck detour associated with BQE work. We are concerned about what could happen when a much larger, long-term reconstruction begins.

Where is the analysis showing how the proposed McDonald Avenue configuration will perform under those future conditions? Have the potential effects on Caton Avenue, Church Avenue, and Linden Boulevard been considered together?

A roadway decision that will affect our neighborhood for years should not be evaluated solely on a snapshot of current traffic. It should account for major, foreseeable changes to the transportation network.

Questions about the traffic data

We are also concerned about the traffic data used to support the feasibility of the McDonald Avenue proposal.

The DOT presentation we reviewed appears to rely on traffic data from July 2026. See DOT’s project presentation. July is a particularly important condition to examine because schools are out and many residents are on vacation. We believe DOT should clearly explain the source, date, and relevance of the data and demonstrate how well it represents typical traffic conditions during the school year.

How can residents evaluate the proposed changes without a clear explanation of the data and assumptions used to support them?

Why are we raising money for a lawsuit?

We have consulted attorney Hartley Bernstein about potential legal options. Mr. Bernstein has brought multiple legal challenges involving DOT bike-lane projects and has been able to stop or delay bike lanes in Manhattan and Queens. Mr. Bernstein’s successes in delaying bike lane installations could give us exactly what we need now. We understand that courts have generally recognized DOT’s broad authority over city streets, and that success in these cases is not guaranteed. One reason we are interested in his experience is that his successful Astoria Boulevard challenge involved procedural issues—an approach that makes the question of DOT’s process particularly relevant to our concerns.

If the attorney determines that there are sufficient grounds, we also want to explore seeking temporary relief to prevent construction from moving forward while the case is considered.

No lawsuit can guarantee a particular result. But we believe our community deserves the opportunity to have these questions examined independently before a permanent change is made to our neighborhood streets.

Please help us reach our $17,000 goal

We are seeking pledges toward a $17,000 legal fund to cover the cost of retaining an attorney. We currently have almost $8,000 pledged, so we still have a significant gap to close.

The timing matters. The full Community Board 7 is scheduled to vote on the proposal on Wednesday, October 21, and DOT has indicated that it expects installation to begin shortly afterward. A Community Board vote against the proposal would not, by itself, prevent the City from proceeding.

Our goal is to raise enough money to retain counsel to assess our legal options promptly and, if appropriate, pursue a challenge and seek temporary relief before construction moves forward.

Under our fundraising terms, pledged funds will be collected only if the full $17,000 goal is reached. If we do not reach that goal, pledges will not be collected.

We know that taking on a city agency is daunting, and we cannot promise a particular outcome. But we believe the questions surrounding this project are serious enough to warrant independent legal review.

We are a small community. We cannot match the resources of a city agency, but together we can fund a serious examination of whether the process behind this decision deserves to be challenged.

This effort is about more than one bike lane. It is about asking our city agencies to show their work, consider the full consequences of their decisions, and listen meaningfully to the communities those decisions affect.

We want safer streets. We want responsible transportation planning. And we want a process in which residents can understand how decisions are made and have confidence that important questions have been answered.

If you share these concerns, please consider making a pledge to help fund this legal effort. Your contribution can help us obtain independent legal review and seek answers before a permanent change is made to our neighborhood streets.

Please join us in asking DOT to show us the data, explain its analysis, and demonstrate that it has considered the whole transportation network—not just one segment of one street.

Pledge and share here: fundrazr.com/42npqa

Thank you for standing with your neighbors.

Troy Martin